Important terms & definition for Garments IE

Here are some key terms & definition related to Garments in Industrial Engineering (IE):

1. SAM (Standard Allowed Minutes): A unit of measurement representing the time required to perform a specific task following standard conditions.

2. Work Study: The analysis of work methods and the establishment of standard times for operations.

3. Line Balancing: Distributing tasks evenly among workstations to optimize production efficiency and reduce bottlenecks.

4. Efficiency: The ratio of actual output to the standard output, often expressed as a percentage.

5. Operation Bulletin: A document detailing the sequence of operations, machine requirements, and time standards for a specific garment.

6. Pre-Production Meeting (PPM): A meeting before production begins to ensure all aspects of production, including materials and methods, are well understood.

7. SMV (Standard Minute Value): Similar to SAM, it represents the time required to perform a specific task but is often used in the context of calculating total time for an entire garment.

8. Batch Production: Producing a certain quantity of garments in a single lot before switching to a different style or product.

9. Method Study: Analyzing and improving work methods to enhance efficiency and reduce unnecessary steps.

10. Motion Study: Analyzing body movements during work to optimize efficiency and minimize fatigue.

These terms are fundamental in the field of Garments Industrial Engineering and play a crucial role in improving productivity and quality in the production process.

একটি মন্তব্য পোস্ট করুন

নবীনতর পূর্বতন